BASE Unit 1 & 2, Caylers Farm, Nuthampstead, Royston SG8 8NA

Oneplace2save
Services directory
Storage options Office ClearancesOffice Removal ServicesHouse RemovalsShort & Long-term StorageMan and VanWaste Removal & RecyclingSofa Collection & DeliveryIT Equipment DisposalMotorcycle Recovery & TransportPiano MovingFilm Equipment Transport
Areas we coverGalleryFurniture Resale ↗Storage
Request a quote Talk to the team · 020 7515 9347
← CASE STUDIES

Inside McLaren’s move from Guildford to Bicester

Across nearly two years, Oneplace2save moved and rebuilt McLaren’s offices, meeting rooms, IT spaces, kitchens and warehouse installations across two large units in Bicester.

After a successful project phase: the team’s improvised F1 pit stop.
Client
McLaren Automotive
Location
Guildford → Bicester, Oxfordshire
Relationship
Early 2024 → October 2025
Project
Phased workplace relocation
Status
Main move completed / support continuing
SERVICES

Phased office relocation · Furniture dismantling and rebuilding · Workspace, shared-area and IT setup · Warehouse shelving and racking

THE QUICK VERSION

The project in 30 seconds

  1. 01

    The challenge

    Different areas across two large units became ready at different times, so the move had to follow the build programme without losing track of destinations.

  2. 02

    The approach

    Each load was grouped by phase and final room. The team dismantled, moved and rebuilt furniture as individual areas came online.

  3. 03

    The outcome

    McLaren’s main relocation completed in October 2025, with offices, shared facilities, IT areas and warehouse spaces prepared for use.

Project checkpoints

First phase began
Early 2024
Main relocation completed
October 2025
Bicester operation
2 large units
Continued support planned
Through 2027
GUILDFORD TO BICESTER

A relocation built around the operation

  1. 01

    Two sites. Two large units. No single moving day.

    The first phase left Guildford in early 2024. By October 2025, Oneplace2save had moved and rebuilt far more than desks and chairs across McLaren’s Bicester operation.

    Built-in furniture, meeting rooms, designer workstations, kitchens, IT rooms and warehouse equipment all had to arrive in the right order as each space became ready.

    Oneplace2save dismantled, transported and rebuilt built-in and freestanding furniture as areas at McLaren’s Bicester operation became ready. The same programme reached investor meeting rooms, designer workstations, kitchens, canteens, IT rooms and warehouse space.

    That meant knowing not only what had to move, but where it belonged, when the room would be ready and what the next team needed to find when they arrived.

    Oneplace2save team member moving office crates between installed workstations during the McLaren relocation. Workstations and reusable moving crates during the McLaren relocation.
    Oneplace2save team member moving office crates between installed workstations during the McLaren relocation.
    Workstations and reusable moving crates during the McLaren relocation.
  2. 02

    The move kept growing

    A move running across months cannot be packed as one job. Furniture for the next handover has to stay accessible; completed rooms have to remain usable; items for one unit cannot disappear into the other.

    The team grouped each load by destination and phase, rebuilt furniture as rooms came online and kept the physical move aligned with the wider programme.

    Oneplace2save team member beside installed desks during a workplace walkthrough for the McLaren relocation. Checking an installed workspace as the next area came into use.
    Oneplace2save team member beside installed desks during a workplace walkthrough for the McLaren relocation.
    Checking an installed workspace as the next area came into use.

What the team handled

From early 2024, Oneplace2save coordinated the physical move phase by phase. Built-in and freestanding furniture was dismantled, grouped for its destination, transported and rebuilt on arrival. The same team worked across designer workstations, investor meeting rooms, kitchen and canteen areas, IT spaces, warehouse shelving and racking.

  1. 01

    Workplaces and meeting spaces

    Designer workstations, investor meeting rooms, and built-in and freestanding furniture.

  2. 02

    Shared facilities and IT

    Kitchen and canteen areas, IT rooms, and the equipment needed as each space became ready.

  3. 03

    Warehouse installations

    Shelving and racking, including storage for specialist leathers and fabrics used in McLaren’s cars.

WAREHOUSE / THE UNSEEN DETAIL

Beyond the offices

  1. 01

    Specialist materials, carefully organised

    One of the most memorable parts of the job sat away from the desks. Oneplace2save installed shelving and racking for the specialist leathers and fabrics used in McLaren’s cars.

    Handling valuable materials is familiar work. Seeing them before they became part of a finished vehicle made this project feel different: a close-up view of the craft behind the cars, inside the space that supports it.

AFTER HOURS / THE PIT STOP

Then somebody found the F1 wheels

  1. 01

    A very unofficial pit crew

    After a successful phase, the team borrowed a few minutes for a joke: genuine McLaren F1 wheels, an office chair and a very unofficial pit crew.

    The relocation had taken nearly two years. The pit stop took considerably less. It was the right ending to a demanding stretch of work—job done properly, client happy, team still laughing.

    Oneplace2save team recreating an F1 pit stop using genuine McLaren wheels and an office-chair rig after completing relocation work. Genuine McLaren wheels and a very unofficial office-chair pit-stop rig.
    Oneplace2save team recreating an F1 pit stop using genuine McLaren wheels and an office-chair rig after completing relocation work.
    Genuine McLaren wheels and a very unofficial office-chair pit-stop rig.
THE RESULT

What changed in practice

The principal relocation was completed in October 2025, with offices, shared facilities and operational spaces prepared for use at Bicester. McLaren continued to trust Oneplace2save beyond the main move as the new operation developed, extending a demanding project into an ongoing working relationship.

  1. 01

    Phased handovers completed across two Bicester units

  2. 02

    Offices, meeting rooms and shared facilities prepared for use

  3. 03

    Furniture rebuilt and installed in its final spaces

  4. 04

    Main relocation completed in October 2025

  5. 05

    Continuing support

    Continued support planned through 2027.

Moving more than an office?

Tell us about the sites, phases and specialist spaces. We’ll plan the move around the way your operation actually needs to work.

Talk through the move

START A PROJECT Clear scope before commitment

Ready when you are.
Let’s make a plan.

Tell us what needs to move, clear, store or recover. We’ll turn the essentials into a practical route forward.

QUOTE