Evercore London: the office support that started with one urgent call

When a time-critical job needed rescuing in 2017, Oneplace2save stepped in. That first call grew into recurring storage, clearance, recycling and office reconfiguration work at Evercore's London headquarters.

Client
Evercore
Location
London headquarters
Relationship
Since 2017
Project
Ongoing facilities support and office reconfiguration
Status
Ongoing relationship
SERVICES

Office furniture clearance · Furniture reuse and responsible recycling · Storage rationalisation · Furniture dismantling and installation · Workstation reconfiguration

THE QUICK VERSION

The project in 30 seconds

  1. 01

    The challenge

    Evercore first needed immediate cover for a time-critical task.

  2. 02

    The approach

    Oneplace2save responded to the urgent task, then worked with the facilities team to sort stored furniture, reduce unnecessary storage, clear and recycle surplus items, and dismantle, move and install furniture as office areas were recommissioned.

  3. 03

    The outcome

    The facilities team gained one dependable point of contact for recurring office changes.

Project checkpoints

Relationship began
2017
Storage locations reviewed
2
Latest documented office reset
7 Nov 2025
Facilities support
Ongoing
THE GUIDED STORY

How the project unfolded

  1. 01

    One urgent job started a much longer relationship

    In 2017, Evercore's office manager contacted Oneplace2save after another contractor could not complete a time-critical task. The facilities team needed somebody who could step in quickly, understand what had to happen and keep the office moving.

    Oneplace2save team moving protected workstation equipment in reusable crates. November 2025 project photography, illustrating the work carried out during the ongoing relationship.
    Oneplace2save team moving protected workstation equipment in reusable crates.
    November 2025 project photography, illustrating the work carried out during the ongoing relationship.
  2. 02

    Two storage spaces had become a job of their own

    At the beginning of the relationship, Evercore was using a large self-storage unit as well as substantial basement storage at its London office. Furniture being retained, items no longer needed and material awaiting a decision had accumulated together.

    Evercore office floor during furniture reconfiguration in London.
    Evercore office floor during furniture reconfiguration in London.
  3. 03

    The job is not only taking things away

    Evercore's workplace changes as teams, layouts and furniture requirements change. The work can involve clearing selected furniture, separating items for reuse or responsible recycling, and then returning to assemble and position what comes next.

    Oneplace2save installation team working across the Evercore office floor.
    Oneplace2save installation team working across the Evercore office floor.
  4. 04

    When the office changes, the facilities team already knows who to call

    The strongest result is not a single before-and-after photograph. It is that Evercore has continued to bring Oneplace2save back as storage is reviewed, furniture changes and working areas are recommissioned.

    Completed workstations following the Evercore London office reset.
    Completed workstations following the Evercore London office reset.
A RECURRING WORKPLACE PROCESS

As the office evolves, the team returns

This is not a one-off clearance. As furniture and layouts change, Oneplace2save connects what leaves with what comes next: clear the outgoing items, identify practical recovery routes and install the replacement furniture.

  1. 01

    Upgrade

    New furniture and workplace layouts create the next brief. The facilities team identifies what must change and which areas need to keep working.

    Completed workstations following the Evercore London office reset.
  2. 02

    Clear

    Outgoing furniture is removed in a controlled sequence, with attention to access and the operation of the wider office.

    Oneplace2save team moving protected workstation equipment in reusable crates.
  3. 03

    Recover

    Furniture is assessed for continued use or responsible recycling, rather than treating every item as waste.

  4. 04

    Rebuild

    Replacement desks and workstation components are assembled, positioned and handed back ready for use.

    Oneplace2save technician installing a sit-stand desk at Evercore London.
7 NOVEMBER 2025 / LONDON HQ

Old furniture out. New workstations ready for use.

The latest photographed project combined both sides of the relationship. Existing furniture was removed for recycling while replacement furniture and workstation components were installed across the London headquarters.

Transcript / video description

Items were protected in reusable moving crates, components were kept together, and the team worked through the office in a controlled sequence. Desks, pedestals and monitor-arm components were assembled and positioned, with furniture-level cabling organised as each workstation was reset.

This was not a drop-and-leave delivery. The aim was to return usable working areas to the facilities team: old furniture out, replacement furniture installed and the next layout ready to move forward.

The detail behind the work

The challenge

Evercore first needed immediate cover for a time-critical task. The wider challenge then became clear: a large self-storage unit and substantial basement storage held a mixture of furniture to retain, reuse, recycle or remove, while the live London office continued to change.

The approach

Oneplace2save responded to the urgent task, then worked with the facilities team to sort stored furniture, reduce unnecessary storage, clear and recycle surplus items, and dismantle, move and install furniture as office areas were recommissioned.

The outcome

The facilities team gained one dependable point of contact for recurring office changes. Storage became more manageable, avoidable holding costs were reduced, and the November 2025 project removed old furniture while new workstations were installed and returned ready for use.

One urgent job started a much longer relationship

Oneplace2save took on the immediate work. The way that job was handled became the start of an ongoing relationship with the people responsible for Evercore's London workplace.

Two storage spaces had become a job of their own

Oneplace2save helped the facilities team work through what was there. Surplus furniture was cleared, suitable items were directed towards reuse or recycling, and the remaining inventory became easier to manage. The practical goal was simple: stop paying to store furniture without a clear future while keeping useful items available to the office.

The job is not only taking things away

Because the same team has supported the site since 2017, each new request begins with useful context. The building, the expected standard and the facilities team are already familiar—so the focus can stay on the current change rather than starting the relationship again.

The useful result is what no longer needs storing

A clearance is not successful because everything disappears. It works when retained items are easy to find, reusable furniture has a clear next destination and recyclable material leaves by the right route.

For Evercore, the continuing benefit has been a more deliberate approach to stored furniture and one team able to connect clearance with the next office setup. That reduces unnecessary holding cost without losing sight of what the workplace may need again.

When the office changes, the facilities team already knows who to call

What began as emergency cover in 2017 has become dependable facilities support: clear decisions on what leaves, a responsible route for surplus furniture and a team that can install what comes next.

THE RESULT

What changed in practice

  1. 01

    External and basement storage brought under better control

  2. 02

    Surplus furniture directed to reuse or recycling routes

  3. 03

    Recurring office changes supported since 2017

  4. 04

    London headquarters reset with new furniture in November 2025

Changing an office against a live deadline?

Tell us what is leaving, what is arriving and which areas must keep working. We'll build the clearance and installation plan around the way your office actually operates.

Discuss your office project

START A PROJECT Clear scope before commitment

Ready when you are.
Let’s make a plan.

Tell us what needs to move, clear, store or recover. We’ll turn the essentials into a practical route forward.

QUOTE